Rough Gas Storage 3B Offshore Recovery

LOCATION: CDS Fabrication Shop and Site Construction Offshore 3B Platform

VALUE: $20m CAD

WORKSCOPE:

CDS scope included the full fabrication and construction to mechanical completion of the Offshore 3B Recovery Programme including by system:

 

3B Platform Works

  • Well Flow-lines
    • Assessment and repair of damaged flow-lines
  • Gas Processing Plant
    • Assessment and deconstruction of all explosion damaged piping systems, structural supports and facility bracings
    • Removal of 4 off shell and tube heat exchangers
    • Installation of 4 off shell and tube exchangers
    • Deconstruction of all damaged mechanical and structural equipment
    • Fabrication and installation of new revised process piping systems
    • Fabrication and installation of all new process modules
    • Fabrication and installation of export pipeline corrosion inhibitor skid
  • Utility/Safety Systems
    • Deconstruction, fabrication and installation tie-in of revised system support infrastructure:
      • Vent and blow-down systems
      • Firewater
      • Plant and Instrument air
      • Fuel gas
      • Nitrogen
      • Drainage system
      • Power generation packages
Centrica - Gas Facility Annual Maintenance
Centrica - Gas Facility Fabrication & Construction
Centrica - Gas Facility Upgrade
Technip - Fabrication
BP/GUPCO - Systems Operations & Training
BAPCO - Hazardous Gas Tester Training

©Copyright 2014 Northern BC Service Company Ltd. - Trading as NBCservco

 

NBCservco, 1066 W.Hastings St. Vancouver, BC, V6E 3X2.