Rough Gas Storage 3B Offshore Recovery
CDS Fabrication Shop and Site Construction Offshore 3B Platform
$20m CAD
CDS scope included the full fabrication and construction to mechanical completion of the Offshore 3B Recovery Programme including by system:
3B Platform Works
-
Well Flow-lines
- Assessment and repair of damaged flow-lines
-
Gas Processing Plant
- Assessment and deconstruction of all explosion damaged piping systems, structural supports and facility bracings
- Removal of 4 off shell and tube heat exchangers
- Installation of 4 off shell and tube exchangers
- Deconstruction of all damaged mechanical and structural equipment
- Fabrication and installation of new revised process piping systems
- Fabrication and installation of all new process modules
- Fabrication and installation of export pipeline corrosion inhibitor skid
-
Utility/Safety Systems
-
Deconstruction, fabrication and installation tie-in of revised system support infrastructure:
- Vent and blow-down systems
- Firewater
- Plant and Instrument air
- Fuel gas
- Nitrogen
- Drainage system
- Power generation packages