York Gas Field Development (On/Offshore)
CDS Fabrication Shop and Site Construction at Onshore Terminal and Offshore Platform
$29m CAD
CDS scope included the full fabrication and construction through to mechanical completion of the Easington Terminal works and offshore hook-up of the York unmanned platform including by system:
-
Inlet Area
- New sphere receiver
- Assessment and re-use of decommissioned slug catcher
-
Gas Processing Plant
- Dehydration – New silica gel adsorption beds + regeneration facilities
- Plot space – Utilize space currently occupied by redundant equipment
-
Sales Gas Filters and Metering
- Sales gas filters
- Sales gas metering runs and connection into NTS
-
Liquids Handling
- New condensate stabilization, off-gas compression systems, existing condensate tanks
-
Tie-in and integration to existing methanol tanks, recovery and delivery systems for conveyance to platform
- Tie-in and integration to existing corrosion inhibitor tanks and delivery systems
- Tie-in and integration to existing waste water treatment and waste water outfall
-
Utility/Safety Systems
-
Tie-in and integration into the following existing system infrastructure:
- Vent and blow-down systems
- Firewater
- Instrument air
- Fuel gas, Nitrogen
- Drainage System
-
Offshore Platform Hook-up Works (43m water depth Jacket 800t, deck 1200t)
- 6 well slots
- Crane, Pig launcher, Helideck, TEMPSC
- Space for future tie-backs