York Gas Field Development (On/Offshore)

LOCATION: CDS Fabrication Shop and Site Construction at Onshore Terminal and Offshore Platform

VALUE: $29m CAD

WORKSCOPE:

CDS scope included the full fabrication and construction through to mechanical completion of the Easington Terminal works and offshore hook-up of the York unmanned platform including by system:

 

Terminal Works

  • Inlet Area
    • New sphere receiver
    • Assessment and re-use of decommissioned slug catcher
  • Gas Processing Plant
    • Dehydration – New silica gel adsorption beds + regeneration facilities
    • Plot space – Utilize space currently occupied by redundant equipment
  • Sales Gas Filters and Metering
    • Sales gas filters
    • Sales gas metering runs and connection into NTS
  • Liquids Handling
    • New condensate stabilization, off-gas compression systems, existing condensate tanks
  • Tie-in and integration to existing methanol tanks, recovery and delivery systems for conveyance to platform
    • Tie-in and integration to existing corrosion inhibitor tanks and delivery systems
    • Tie-in and integration to existing waste water treatment and waste water outfall
  • Utility/Safety Systems
    • Tie-in and integration into the following existing system infrastructure:
      • Vent and blow-down systems
      • Firewater
      • Instrument air
      • Fuel gas, Nitrogen
      • Drainage System
  • Offshore Platform Hook-up Works (43m water depth Jacket 800t, deck 1200t)
    • 6 well slots
    • Crane, Pig launcher, Helideck, TEMPSC
    • Space for future tie-backs
Centrica - Gas Facility Annual Maintenance
Centrica - Gas Facility Fabrication & Construction
Centrica - Gas Facility Upgrade
Technip - Fabrication
BP/GUPCO - Systems Operations & Training
BAPCO - Hazardous Gas Tester Training

©Copyright 2014 Northern BC Service Company Ltd. - Trading as NBCservco

 

NBCservco, 1066 W.Hastings St. Vancouver, BC, V6E 3X2.