Sable Field Development, South Africa
LOCATION: CDS fabrication facility and quayside load-out facility
VALUE: $1.15m CAD
WORKSCOPE:
Carry out shop fabrication and load out of pulling heads piggy back pipework, AWD clamps, NDT testing, dimensional checking to meteorology reports, hydro testing of high pressure pipework and testing of pullling heads.
©Copyright 2014 Northern BC Service Company Ltd. - Trading as NBCservco
NBCservco, 1066 W.Hastings St. Vancouver, BC, V6E 3X2.